2 datasets found

Restoration Activities: Aquatic Connectivity Metric Classes: Elevation Formats: PDF

Filter Results
  • Upper-Town Dam Final Design Plans

    Final dam removal design plans for the Upper-Town Dam in Lisbon, Maine. This project removed a derelict mill dam that impounded 6 feet at water when the spillway was intact....
  • John Heinz NWR Bathymetric and Topography Data

    Topography and bathymetric data set collected via RTK units by Ducks Unlimited and US Fish and Wildlife Service surveyors both inside and outside the NWR impoundment. Data were...