-
Runneling Monitoring Data IV
PRR GPX files for GPS -
Tindal living shoreline (partiall funded by VEE)
A living shoreline located on the Nansemond River in Suffolk. Partially funded by NFWF and the Virginia Environmental Endowment. -
Morrison living shoreline (Partially funded by VEE)
A living shoreline located on the Warwick River in Newport News. Partially funded by NFWF and the Virginia Environmental Endowment. -
Klenner living shoreline (Partially funded by VEE)
A living shoreline located on the Warwick River in Newport News. Partially funded by NFWF and the Virginia Environmental Endowment. -
Kelley living shoreline (Partially funded by VEE)
A living shoreline on the Hampton River in Hampton. -
Adamo living shoreline (partially funded by VEE)
A living shoreline located on Fisher's Creek in Newport News. Partially funded by NFWF and the Virginia Environmental Endowment. -
River Club Dr living shoreline
A living shoreline consisting of oyster castles to protect an extant marsh. Located on the Nansemond River in Suffolk. -
Windsor Castle Park as built plans
A living shoreline located at Windsor Castle Park on Cypress Creek -
Deep Water Way living shoreline
A living shoreline located on Deep Water Way. Brewers Creek. Carroll, VA. -
Site Plan - Lindenwood-Barraud Park Living Shoreline
Final site plan for construction of the Lindenwood-Barraud Park Living Shoreline. Plans includes pre-construction conditions with topography, demo and grading plans, and... -
Monitoring Plan - Lindenwood-Barraud Park Living Shoreline
Plan developed for monitoring of physical and biological conditions -
As-built - Lindenwood-Barraud Park Living Shoreline
As-built survey at completion of project -
Salt River Vegetation Biomass Cover Type
2019, 2020, and 2021 percent cover vegetation monitoring data. -
Engineering and Design Documents 62661
E&D documents including Final project design drawings, Construction Field and Change Orders, Design Alternative Analysis Report, and Geotech Report -
Monitoring Reports 62661
Monitoring will be conducted for the first two years starting in October 2022. The site will be monitored by plot transect method, using 15-meter transects laid at an... -
Leque Island
Studies completed to inform Leque Island restoration project design and pre/post project monitoring data. The Leque Island restoration project is a 250-acre tidal restoration... -
Post project metric data report
This folder that contains post-project metric data. -
Upper-Town Dam Final Design Plans
Final dam removal design plans for the Upper-Town Dam in Lisbon, Maine. This project removed a derelict mill dam that impounded 6 feet at water when the spillway was intact.... -
Dune Metrics for Dune Restoration Sites on the North Coast of Puerto Rico
Dune metrics for ecological restoration sites along the north coast of Puerto Rico. These sites are being restored using the following methods: installation of wooden... -
Numerical Modeling Effects of Hurricane-Induced Waves and Water Levels
Coastal sand dunes provide a natural protection against strong wave forces/attack and storm surge. The dunes help protect coastal community and infrastructure and prevents or...